Construction at the Church
DPI Construction will be staging materials and equipment for the canopy construction beginning Monday 05.06.24. Consequently the following will occur.
1. The driveway area from the fence between the Office entry and the Library will be closed off with safety cones during the normal work hours of 7:00 AM–4:00 PM.
2. The area of the driveway from the island sidewalk to the Southeast corner of the planted area in the Atrium will also be closed off to vehicle traffic during the same period.
3. The upper, Spectrum School, Deale Hall/stairway door will be accessible at all times.
4. The Library door that opens into the Atrium area and the main entry doors will be restricted to emergency use only.
5. Areas of the Atrium sidewalk along the Library and along the sidewalk adjacent to Deale Hall may be restricted by materials and or equipment.
The construction project should probably be completed by the end of the week Friday, 05.10.24 unless delayed by weather.
|